Idaho Construction Lending Requirements

An off-site engineer can outrank a mortgage recorded before anything happened on the ground.

Reviewed April 26, 2026Last statutory change 2024-2025 · DOPL registration restructuringStatutes and disclaimer

  • Priority over prior mortgageCan relate back

  • Statutory waiver formNot statutory

  • Notice of commencementNot recognized

  • Contractor licensingRegistration (DOPL)

  • Preliminary noticeNot required; 1–4 units: GC disclosure

  • Retainage5% cap; owner-occupied 1–4 by contract

What a construction lender needs to know about Idaho

Idaho relates liens back to commencement, and its signature risk is off-site: under Hap Taylor, an engineer, surveyor, or architect's priority dates to the day they began work — so a site inspection of untouched ground proves nothing about a design professional hired months earlier. On residential work of 1–4 units over $2,000, the contractor must give the homeowner a rights disclosure and, before final payment, a list of every sub, supplier and equipment renter under direct contract with the GC over $500 — which doubles as the lender's waiver-collection baseline. Commercial work carries almost no preliminary-notice burden; retainage is capped at 5% on commercial and multi-family (5+ units) projects, with owner-occupied 1–4 units governed by contract.

Commercial work has almost no notice hurdles.

Idaho grants liens to anyone furnishing labor, materials, or professional services such as engineering and surveying. Subcontractors and suppliers owe no preliminary notice on private commercial work — so no statutory notice warns you before a claim appears.

Residential work of 1–4 units over $2,000 is the exception: the prime owes the homeowner a written disclosure of their rights before signing.

Commercial and multi-family
No preliminary notice from subs or suppliers.

Off-site professional services can break your position.

Liens are preferred over any encumbrance attaching after the building was commenced or work, materials, or professional services began. Record before any work begins, and understand the Idaho Supreme Court’s hard lesson: professional services performed off site — design, engineering — can start the clock before there is anything visible on the ground to inspect.

A clean site walk is not proof that the clock has not started.

Relation-back dateCommencement of work or services
Includes off-site servicesDesign and engineering count
Site inspection aloneNot sufficient diligence

An unregistered contractor waives its own lien.

Every contractor and subcontractor must register with DOPL, and one who fails to register is conclusively deemed to have waived any right to a mechanics lien. That makes the registry a genuine underwriting tool here.

Unregistered means no lien
Verify the contracting entity itself, not just an individual owner or member.
Sub-tiers can still lien
Registered subs and suppliers under an unregistered contractor may keep lien rights only if they did not know of the nonregistration or reasonably believed the contractor was registered.
Check before closing
Verify registration and specialty licenses on the DOPL lookup.

Unregulated text, which puts the drafting on you.

Idaho prescribes no waiver form and has no statute prohibiting advance waivers — but do not build the file on one without Idaho counsel. Because the state does not regulate the language, make sure your form does not accidentally release broader contractual rights.

Run the draw-by-draw exchange and treat waivers as an audit trail, not proof that the supply chain has been paid.

  • Conditional · current draw
  • Unconditional · previous draw

The 5% cap holds unless a requested bond is not provided.

On commercial and multi-family of five units or more, retainage may not exceed 5% of each payment or of the contract price — unless a performance bond was requested and the contractor did not provide it, in which case the contract governs. Owner-occupied 1 to 4 unit work is exempt.

There is no private prompt payment act for progress payments, but retainage moving down to subs runs on a 10-day clock.

Commercial · 5+ units5% cap
Bond requested and not providedCap does not apply
Owner-occupied 1 to 4 unitsExempt, by contract

Idaho Lien Law Overview

Idaho’s mechanics lien laws provide a security interest to any person performing labor, or furnishing materials, or providing professional services (like engineering or surveying) for the construction or alteration of any building or structure. Idaho is a “relation-back” state, meaning lien priority is tied to the commencement of work.

A major procedural distinction exists for residential properties. While commercial projects have very few preliminary notice hurdles, general contractors working on residential real property (1-4 units) where the contract exceeds $2,000 are subject to strict disclosure requirements to the homeowner (Idaho Code § 45-525).

Impact on Owners: This statutory disclosure acts as a “bill of rights” for the homeowner. Prior to entering into a contract, the General Contractor must inform the owner in writing of their right to: (1) require lien waivers from subcontractors at the owner’s expense (meaning the homeowner is responsible for any administrative costs or fees associated with gathering these waivers), (2) receive proof of the GC’s general liability and workers’ compensation insurance, (3) purchase extended title insurance for unrecorded liens (meaning a policy that protects against mechanics liens that have not yet been filed in the public record but may still be valid), and (4) require a surety bond for the project. Later in the project, within a reasonable time prior to closing or final payment, the GC must also provide a separate disclosure listing subcontractors, materialmen, and rental equipment providers having a direct contractual relationship with the general contractor and who supplied materials or performed work on the residential property in excess of $500 (Idaho Code § 45-525(3)(a)). If the GC fails to provide these disclosures, it constitutes an unlawful and deceptive act under the Idaho Consumer Protection Act, giving the homeowner the right to sue, seek restitution, and potentially pursue rescission of the construction contract (needs Idaho attorney verification).

Impact on Lenders: For construction lenders, this disclosure requirement is a critical risk-mitigation tool that supports the audit trail. First, for residential work subject to Idaho Code § 45-525, Idaho Code § 45-507(3)(e) plainly requires the claim of lien to include proof of disclosure and acknowledgment of receipt. Failure to include the required disclosure materials creates a statutory defect, though fact-specific enforceability challenges should be reviewed with Idaho counsel based on the claim facts. Second, the mandatory list of GC-contracted lower-tier participants provides the lender’s draw administrator with a statutory list of GC-contracted subcontractors, materialmen, and rental equipment providers over $500, subject to statutory limitations. Note that this list covers only parties with a direct contractual relationship with the general contractor. This allows the lender to use the disclosure list as a baseline for waiver collection, especially at final draw, and as a reference point for progress-draw risk controls where required by the lender’s loan documents or draw procedures. Without verifying this disclosure, the lender lacks a statutory baseline to monitor GC-contracted lower-tier participants, increasing the risk of funding a project exposed to statutory penalties.

Mortgage Priority

Will an Idaho Lien have priority over pre-existing mortgages or construction loans? Generally, no, provided the construction mortgage is recorded before any work begins or materials are furnished.

Idaho follows a strict “relation-back” doctrine. Under Idaho Code § 45-506, mechanics liens are preferred to any lien, mortgage, or other encumbrance which may have attached subsequent to the time when the building, improvement, or structure was commenced, work done, or materials or professional services were commenced to be furnished.

Establishing Priority: To establish reduced mechanics lien priority risk, subject to Idaho Code § 45-506 and off-site professional services risk under Hap Taylor, the construction lender must record the deed of trust in the county recorder’s office before any work begins.

CRITICAL RISK WARNING: The “Off-Site Professional” Exception A landmark Idaho Supreme Court decision (Hap Taylor & Sons, Inc. v. Summerwind Partners, LLC) established a severe priority risk for construction lenders. The court ruled that the priority date for an engineer, surveyor, or architect’s lien is the date they commenced furnishing authorized professional services under contract, regardless of where the services were rendered.

  • The Risk: Even if a pre-closing site inspection shows pristine, undisturbed land with no visible dirt moved, a previously hired engineer’s lien can leapfrog a newly recorded mortgage.
  • Mitigation: Lenders should always inquire about pre-construction professional services, collect unconditional waivers from these professionals at closing, and utilize ALTA 32/33 endorsements to help mitigate the risk of unrecorded “relation-back” liens, subject to policy terms and conditions. Note that inspections and endorsements reduce risk but do not absolutely guarantee lien priority.

Retainage Overview

Idaho regulates private retainage under its general contract statutes, specifically capping withholdings based on the presence of a performance bond.

  • Commercial & Multi-Family (5+ Units): Under Idaho Code § 29-115(2), retainage withheld by an owner or original contractor must not exceed 5% of each payment, and the total retention may not exceed 5% of the contract price. This statutory 5% cap explicitly does not apply if the owner or contractor requests a performance bond and the contractor fails to provide it (in which case, retainage withholding limits default to the private contract terms).
  • Residential Exemption (1-4 Units): The 5% statutory retainage cap explicitly does not apply to private works of improvement to residential real property consisting of one to four units occupied or to be occupied by the owner (Idaho Code § 29-115(2)). For these projects, retainage is governed entirely by the private contract.
  • Substantial Completion Reduction: Under Idaho Code § 29-115(3), within 35 days from the date the work of improvement is substantially complete, as mutually agreed to by the parties, retainage must be reduced to the lesser of: 150% of the estimated value of the remaining work, or the retainage then withheld, subject to the applicable 5% statutory cap.
  • Release Timeline: Retainage withheld by the owner must be released within 35 days from the date of final completion of the work, except in the event of a dispute, where the owner may withhold up to 150% of the disputed amount (Idaho Code § 29-115(3)).
  • Escrow: Idaho does not statutorily mandate that private retainage be held in an interest-bearing escrow account.

Prompt Payment Act

Idaho does not have a comprehensive Prompt Payment Act applicable to overarching progress payments on private construction projects (its Prompt Pay Act under § 67-2302 strictly applies to public works).

However, downstream retainage payments on private projects are strictly regulated. Under Idaho Code § 29-115(4), within 10 days from the time that all or any portion of the retention proceeds are received by the original contractor, the original contractor must pay each of its subcontractors their respective share of the retention.

Lender Impact: Draw administrators handling private loans should rely on the specific progress payment timelines negotiated in the borrower’s prime contract, but should be aware of the strict 35-day final retainage release deadline mandated by Idaho Code § 29-115(3) to avoid breach of contract and delayed completion.

Title Practices

Under Idaho law, state statutes do not require title companies to administer construction loan disbursements. Lender-managed disbursements (or third-party draw administration) represent the standard industry practice.

To maintain reduced lien priority risk, verifying title and monitoring for liens at each draw is a primary best practice. Construction lenders should objectively utilize one of three primary options to support their audit trail:

  1. Lien monitoring subscription services.
  2. Title updates (which check public records but provide no insurance and do not prove all lienable parties have been paid).
  3. Title endorsements (which may provide coverage subject to the policy terms).

Strategic Benefit of ALTA Endorsements: It is highly recommended that lenders utilize ALTA 32 (Construction Loan) and ALTA 33 (Disbursement) title endorsements. Because Idaho case law (Hap Taylor) allows professional services rendered off-site to establish a relation-back priority date that can defeat a newly recorded mortgage, relying purely on a physical site inspection is insufficient. These endorsements may provide coverage subject to policy terms, exceptions, exclusions, underwriting, and claim facts (needs Idaho attorney verification regarding title insurance coverage scopes). Regardless of the method chosen, leveraging these tools to monitor encumbrances and verify public filings prior to releasing draws is a critical step in a comprehensive risk mitigation strategy.

Lien Waivers

Idaho does not mandate or publish specific, fill-in-the-blank statutory forms for lien waivers.

Lien Waiver Summary

Because Idaho does not prescribe statutory lien waiver forms, waivers are treated strictly as contractual agreements. While waivers support the lender’s audit trail, they do not guarantee that downstream payment status is fully resolved.

  • Advance Waivers: Idaho has no specific statutory provision prohibiting advance lien waivers (waiving rights before work begins or payment is made). However, advance waivers should not be relied on as the primary lien-control tool without Idaho counsel review (needs Idaho attorney verification).
  • Best Practice: Lenders should rely on carefully drafted, standardized custom waiver forms. Because the state does not regulate the text, lenders should ensure the waiver language is clear and does not unintentionally waive broader contractual rights. It is strongly recommended to enforce a strict draw-by-draw exchange using Conditional Waivers for the current draw amount and Unconditional Waivers for previously funded draws to document that payment was received.

Lien Waiver Notarization

Idaho law does not require lien waivers to be notarized to be considered legally valid and effective. A signed, written agreement is sufficient.

Notices

Notice of Commencement (or similar like event)

Idaho DOES NOT recognize or require a recorded Notice of Commencement for private construction projects to establish project start dates or trigger lien filing timelines. Priority is determined strictly by the actual commencement of work, materials furnished, or professional services rendered.

Preliminary Lien Notifications

Idaho does not require traditional preliminary notices (such as a 20-Day Notice of Furnishing) from subcontractors or suppliers to preserve mechanics lien rights on private commercial projects.

However, on Residential Projects (1-4 Units) exceeding $2,000, the General Contractor must provide specific written disclosures to the homeowner. Prior to entering into a contract, the GC must detail the homeowner’s rights (Idaho Code § 45-525(2)). Additionally, within a reasonable time prior to closing or final payment, the GC must provide a separate disclosure identifying subcontractors, materialmen, and rental equipment providers having a direct contractual relationship with the general contractor and who supplied materials or performed work on the residential property in excess of $500 (Idaho Code § 45-525(3)). Note: “Prior to closing” refers to the final real estate closing or final contract payment, not the closing of the initial construction loan.

Notice of Completion (or similar like event)

Idaho DOES NOT utilize a statutory Notice of Completion to truncate or alter the deadline for contractors to file mechanics liens on private projects. The lien filing deadline strictly remains 90 days from the individual claimant’s actual completion of labor or services, or furnishing of materials (Idaho Code § 45-507).

General Contractor Residential Disclosure Statement

Under Idaho Code § 45-525, for residential projects (1-4 units) where the contract exceeds $2,000, the General Contractor must provide the homeowner with written disclosures. This document must list the business names, addresses, and telephone numbers of subcontractors, materialmen, and rental equipment providers having a direct contractual relationship with the general contractor and who supplied materials or performed work on the residential property in excess of $500, and must be provided within a reasonable time prior to closing or final payment (Idaho Code § 45-525(3)(a)). This list covers only parties with a direct contractual relationship with the general contractor. (Note: The separate homeowner’s rights disclosure outlining lien waivers and insurance under § 45-525(2) may be embedded conspicuously within the construction contract. Furthermore, “prior to closing” in this context refers to the final real estate closing or the end of the project, not the initial closing of the construction loan).

The Impact and Benefit: Because Idaho does not require standard commercial-style preliminary notices (e.g., a “Notice to Owner”), this disclosure serves as the primary statutory mechanism to establish project transparency. The core benefit is that it provides a legally mandated baseline list of GC-contracted subcontractors, materialmen, and rental equipment providers over $500, subject to statutory limitations, giving the lender visibility into GC-contracted lower-tier participants who possess mechanics lien rights.

Why Lenders Should Ensure Compliance: While Idaho Code § 45-525(3) does not mandate that the GC produce the list of subcontractors until “a reasonable time prior to closing or final payment,” ensuring this document is collected before the final draw is a crucial component of a lender’s risk mitigation strategy and audit trail.

Because the GC is not legally required to provide this sub-tier list month-to-month, it can be highly impractical (or create significant project friction) for a lender to compel the collection of sub-tier waivers during every progress draw. To balance this, lenders typically rely on a dual-layered defense:

  1. During Progress Draws: The lender primarily protects its position by collecting standard trailing lien waivers from the GC and requiring a date-down title endorsement (like an ALTA 33) before funding each progress draw. The title endorsement acts as a risk mitigant against unrecorded liens, subject to policy terms, while the GC manages the sub-tier payments.
  2. At the Final Draw: Because the title endorsement does not guarantee that the GC actually paid their subs, the lender should pivot to direct document collection at the end of the project. Before releasing the final payment, the lender should require the GC to produce the Residential Disclosure Statement detailing applicable subcontractors. The lender then uses this list to pursue Unconditional Final Lien Waivers directly from those downstream parties, materially reducing tail risk before the loan transitions to permanent financing.

In short, the disclosure and waivers are proactive risk-reduction tools; the title endorsement is a supplemental protection subject to policy conditions. Utilizing both supports a stronger audit trail but does not guarantee absolute immunity from lien claims.

Implications of Non-Compliance: Failure to collect this disclosure carries severe legal consequences. For residential work subject to Idaho Code § 45-525, Idaho Code § 45-507(3)(e) requires the claim of lien to include proof of disclosure and acknowledgment of receipt. Failure to include the required disclosure materials creates a statutory defect, though fact-specific enforceability challenges should be reviewed with Idaho counsel. Furthermore, the omission constitutes an unlawful and deceptive act under the Idaho Consumer Protection Act, and may support homeowner remedies and discipline; do not assume the contract is automatically voidable unless confirmed by Idaho counsel (needs Idaho attorney verification).

Format and Location: The homeowner’s rights disclosure (§ 45-525(2)) is typically presented as a separate document signed prior to the prime contract or embedded directly within the construction contract itself. Conversely, the list of subcontractors (§ 45-525(3)(a)) must be provided within a reasonable time prior to closing (referring to real estate closing/final payment) or final payment, meaning it cannot be practically embedded in the initial construction contract and is provided separately.

Practical Examples & Scenarios

  • Example 1: Disclosure Ignored at Final Draw (High Risk): A project reaches completion, and the GC requests the final $50,000 draw. The draw administrator, assuming the ALTA 33 endorsements from previous progress draws are sufficient, simply collects a final waiver from the GC and funds the draw without requesting the statutory sub-tier disclosure list. The GC takes the money but leaves the framing subcontractor unpaid. Because the lender failed to verify the required disclosure, they were unaware of the framer and didn’t require a final sub-tier waiver. The unpaid framer files a mechanics lien. Title coverage may be affected depending on policy terms, exceptions, and claim facts (needs Idaho attorney verification).
  • Example 2: Disclosure Utilized at Final Draw (Proper Mitigation): A project nears completion. Before processing the final draw request, the draw administrator demands the GC’s Residential Disclosure Statement. The administrator cross-references the list and requests Unconditional Final Waivers from the framing, electrical, and plumbing companies — in addition to the GC — before releasing the final funds. By using the disclosure as a reference baseline at the end of the project, the lender supports its audit trail and materially reduces post-completion lien risk.
  • Example 3: Disclosure Provided, but a Party is Omitted by the GC (Insurance Protection): At the final draw, the lender collects the Residential Disclosure Statement, but the GC intentionally omits “XYZ Electric.” The draw administrator diligently collects final waivers from all disclosed parties and funds the project. The unpaid XYZ Electric later files a mechanics lien. Because the draw administrator followed risk mitigation procedures and relied in good faith on the statutory disclosure list, title coverage may be available but ultimately depends on policy language, endorsements, exceptions, underwriting requirements, and claim facts (needs Idaho attorney verification). Furthermore, the GC’s omission violates Idaho Code § 45-525, which may provide the owner and lender legal leverage against the GC.

Document References

  • General Contractor Disclosure Statement: A statutory disclosure required on residential projects (1-4 units) over $2,000. It benefits the lender and owner by acting as a statutorily required list of GC-contracted lower-tier participants, providing a baseline reference for identifying parties who should provide lien waivers during the draw process. (Idaho Code § 45-525(3)).
  • Claim of Lien: The formal, verified document recorded with the county recorder to perfect a mechanics lien. It encumbers the title and defines the claim amount. It must be filed within 90 days after the completion of the labor/services or furnishing of materials. Crucially, a true and correct copy of the claim of lien must be served on the owner or reputed owner no later than five (5) business days following the recording of the claim. Service must be completed either by certified mail to the owner’s last known address or by personal delivery by an officer authorized by law to serve process; ordinary hand-delivery by a claimant who is not authorized to serve process is invalid (Idaho Code § 45-507(5)). Additionally, for residential properties (1-4 units) subject to Idaho Code § 45-525, Idaho Code § 45-507(3)(e) plainly requires the claim of lien to include proof of disclosure and acknowledgment of receipt. Failure to include the required disclosure materials creates a statutory defect, though specific enforceability challenges should be reviewed with Idaho counsel based on the facts.
  • Lien Enforcement (Lawsuit): A recorded lien does not last indefinitely. To enforce it, the claimant must commence a proceeding in a proper court within six (6) months after the claim has been filed (Idaho Code § 45-510). If suit is not filed within 6 months, the lien is statutorily dissolved. Under Idaho Code § 45-513 and Idaho Code § 45-507(7), the court shall allow as part of the costs the moneys paid for filing and recording the claim, and reasonable attorney’s fees.

Contractor Licensing & Bond Requirements

Contractor registration in Idaho is managed strictly by the state through the Division of Occupational and Professional Licenses (DOPL).

  • Contractor Registration: All contractors and subcontractors performing construction work in Idaho must register with DOPL (Idaho Code § 54-5204). Lien-right consequences for failing to register are significant but fact-specific. The contracting entity itself — not merely an individual owner or member — must be verified (needs Idaho attorney verification).
  • Effect of Contractor Registration on Lien Rights: Under Idaho Code § 54-5208, a contractor who fails to properly register is conclusively deemed to have waived any right to place a mechanics lien. Crucially, registered subcontractors, independent contractors, employees, and material suppliers may preserve lien rights when working under an unregistered contractor only if they did not have actual knowledge of the nonregistration or reasonably believed the contractor was registered. Verifying licenses is a critical risk mitigation step for all parties involved in an Idaho project.
  • Insurance Requirements: While a blanket surety bond is not required for general registration, applicants must provide proof of general liability insurance with a minimum limit of $300,000 (Idaho Code § 54-5210).
  • Specialty Trades: Plumbers, electricians, and HVAC professionals must hold specific occupational licenses issued by DOPL (Title 54, Idaho Code).
  • License Lookup: Lenders should verify contractor registration and specialty licenses prior to closing via the official state portal: Idaho DOPL License Lookup (dopl.idaho.gov).

Frequently Asked Questions

If our pre-closing site inspection revealed that no physical work has started, but the borrower mentioned their architect has been drafting plans for three months, does this affect our mortgage priority in Idaho?

Yes, this is a significant priority risk. Under the Idaho Supreme Court decision in Hap Taylor & Sons, Inc. v. Summerwind Partners, LLC, a professional’s mechanics lien (such as an architect or engineer) relates back to the date they commenced furnishing authorized professional services, regardless of whether those services were rendered off-site or resulted in visible changes to the property. Because their work started three months ago, their lien priority predates your mortgage. You should mitigate this by securing a specific unconditional lien waiver from the architect prior to closing, and utilizing ALTA 32/33 title endorsements to help mitigate the risk of unrecorded relation-back liens, subject to policy terms and conditions.

We are funding a $1M commercial project. Can we withhold 10% retainage from the General Contractor throughout the entire build to ensure completion?

It depends on whether a performance bond is in place. Under Idaho Code § 29-115(2), if the original contractor provides a performance bond, the maximum retainage that can be withheld is strictly capped at 5% of each payment and 5% of the total contract price. However, if no performance bond is requested, the statutory 5% cap still applies. The only exception where you are legally permitted to withhold a higher percentage (as governed by your private contract) is if you specifically request a performance bond and the contractor fails to provide it. Additionally, under Idaho Code § 29-115(3), within 35 days from the date the work of improvement is substantially complete, as mutually agreed to by the parties, the withheld retainage must be reduced to the lesser of 150% of the estimated value of the remaining work, or the retainage then withheld, subject to the applicable 5% statutory cap. You should review the project’s bond status and progress to ensure your draw schedule accurately reflects the applicable statutory caps.

The General Contractor on a custom home build refuses to provide the homeowner with a list of subcontractors, claiming it is proprietary information. Can we require them to disclose this before funding?

Yes. For residential properties (1-4 units) where the contract exceeds $2,000, Idaho Code § 45-525 requires that the general contractor provide a written disclosure statement to the homeowner listing the business names, addresses, and phone numbers of subcontractors, materialmen, and rental equipment providers having a direct contractual relationship with the general contractor and who supplied materials or performed work on the residential property in excess of $500. While the statutory deadline allows the GC to provide this list within a reasonable time prior to final payment or purchase closing, you may impose stricter deadlines through your loan documents. The draw administrator should request the list prior to processing the final draw (or earlier draws, if contractually required) to support the collection of necessary sub-tier final lien waivers.

A plumbing subcontractor refused to sign our custom conditional waiver, stating Idaho law doesn’t require them to sign non-statutory forms. Can we withhold their funds?

Because Idaho does not prescribe statutory lien waiver forms, waivers are treated as contractual documents. While the state does not legally mandate a subcontractor to sign a specific form, you generally have the contractual right to withhold disbursement if the prime contract or loan agreement explicitly conditions payment upon the execution of your approved lien waivers (needs Idaho attorney verification regarding contract enforcement). You should review the prime contract to ensure it requires the execution of lender-approved waivers, and request a mutually agreeable, clear conditional waiver before releasing the plumber’s funds.

Statutes and disclaimer

State statute reference

§ 45-501 et. seq.
Idaho Code Title 45, Chapter 5
Last statutory change
2024-2025 — DOPL registration restructuring: Moving contractor registration to two-year cycles. Core lien statutes remain in Title 45, Chapter 5
Reviewed
April 26, 2026 by Land Gorilla

Disclaimer

Information on this website is provided for informational purposes only and is not intended to be legal advice or establish an attorney-client relationship. Construction law can change at any time, so the information on this website may not be the most up-to-date information available. The information on this website is posted “as is” and no representations are made that the content is without errors. Use of this website does not create an attorney-client relationship between Land Gorilla, content creators, law firms, and any other contributors to this website. Users of this website should contact their own legal counsel for advice with respect to any legal matters.