Construction Lending State Compliance Library
Illinois Construction Lending Requirements
Recording first buys you the land’s value only — lien claimants take the value the work added.
Reviewed April 18, 2026Last statutory change 2025 · House Bill 4660Statutes and disclaimer
Priority over prior mortgageYes, on value added
Statutory waiver formNot statutory
Notice of commencementNot recognized
Contractor licensingGC licensing is local only
Preliminary notice60 and 90 days
Retainage10%, then 5%; 1–12 units by contract
The brief
What a construction lender needs to know about Illinois
Illinois is notoriously difficult for construction lenders: recording first doesn’t fully protect you. The lien attaches as of the construction-contract date, and under the enhancement-value rule the lender recovers first only from the value of the vacant land while lien claimants recover first from the value the work added — so your lien never reaches the building first. A key defense is the Section 5 sworn statement, a notarized GC affidavit listing every subcontractor and balance that must be collected and reconciled against waivers at each draw, or the owner and lender face double-payment liability. Retainage on covered commercial and multi-family (13+ units) work is capped at 10% and must step down to 5% at 50% completion; subs must serve a 90-day notice on every project, plus a 60-day notice on owner-occupied single-family homes.
Lien law
The lien attaches at the contract, not at the shovel.
An Illinois lien attaches as of the date of the construction contract, which puts relation-back in play before anything is visible on site. The definition of improvement is unusually broad, reaching engineers, architects, property managers, and interior designers — not just labor and materials.
On an owner-occupied single-family home, subs must serve both notices — 60 days and 90 days — to hold their rights.
- Owner-occupied single-family
- 60-day notice to the owner, plus the 90-day notice.
Priority
Enhancement value: the shield has a hole in it.
Record before the construction contract is signed and you hold first priority on the land. That is as far as it goes. In foreclosure, proceeds are apportioned — you recover from the value of the land before improvements, and lien claimants take priority in the value their work added.
No recording date fixes this. The defense is administrative: sworn statements, reconciled waivers, and title endorsements at every draw.
The Illinois signature
No sworn statement, no defense.
The Section 5 sworn statement is a notarized affidavit from the general contractor listing every subcontractor, their contract amount, prior payments, and the current balance. Fund a draw without it and you carry strict double-payment liability to unpaid subs.
- Collect it every draw
- It is the statutory record of who is owed what, and the basis of your defense against hidden sub-tier claims.
- Reconcile it against the waivers
- Every party with a balance on the sworn statement needs a matching waiver before you fund.
- Use through-date waivers
- Custom forms are all Illinois offers — write them with an explicit through date rather than an ambiguous amount paid.
Retainage
On commercial and 13+ unit work, a flat 10% for the whole job is illegal.
On commercial and multi-family work of 13 units or more, you may hold up to 10% until the contract reaches 50% completion. At that point retainage must step down so no more than 5% is held, and no more than 5% may be held on later progress payments.
Residential work of 12 or fewer units in a single building is exempt, and runs on the contract.
Deadlines
On commercial and 13+ unit work, an unanswered payment application approves itself.
On that work, a payment application is deemed approved 25 days after receipt unless the owner puts the withholding in writing, and payment is then due within 15 days. Late money runs 10% per annum and a contractor can suspend work on 7 days’ notice.
You have an accelerator too: serve a Section 34 demand and the claimant must file foreclosure within 30 days or forfeit the lien.
Illinois Lien Law Overview
Illinois’s mechanics lien laws (770 ILCS 60/0.01 et. seq.) are highly complex and extremely protective of contractors, subcontractors, and suppliers. A mechanics lien is created by a contract with the property owner (or an authorized agent) to improve a tract of land. Under 770 ILCS 60/1, the lien attaches as of the date of the contract, creating immediate relation-back implications.
Broad Definition of Improvement: It is critical for lenders to understand that under 770 ILCS 60/1, the statutory definition of an “improvement” is exceptionally broad. It extends mechanics lien rights not just to standard physical labor and materials, but explicitly to parties furnishing professional engineering, architecture, structural engineering, property management, and interior design.
A critical statutory distinction exists between owner-occupied single-family residential projects and commercial/multi-family projects. On owner-occupied single-family homes, subcontractors MUST serve a 60-day notice to the owner (770 ILCS 60/21) to preserve their lien rights, whereas all other property types rely on a standard 90-day notice (770 ILCS 60/24). Furthermore, Illinois utilizes a statutory “Sworn Statement” mechanism that dictates exactly how owners and lenders track downstream payees to avoid double-payment liability.
Critical Risk Snapshot
Illinois is notoriously difficult for construction lenders due to three massive strict-liability traps:
- The Enhancement Value Exception: Mortgages do not have absolute priority over the physical improvements, even if the mortgage is recorded before work begins. Under 770 ILCS 60/16, if a project is foreclosed, the proceeds are apportioned: the lender has first priority only to the value of the vacant land, while mechanics lien claimants have first priority to the value added by the improvements. This “enhancement value” rule means a recorded mortgage cannot entirely shield a lender from lien exposure, necessitating rigorous title endorsement practices.
- The Section 5 Sworn Statement: If an owner or lender funds a draw without obtaining this specific statutory affidavit from the general contractor, they face strict double-payment liability to unpaid subcontractors. Under 770 ILCS 60/5, this notarized document MUST list every subcontractor, their total contract amount, previous payments, and the current balance due. Disbursing funds without reconciling this statement against collected lien waivers strips the lender of their statutory defense against hidden sub-tier claims.
- The 50% Retainage Step-Down: On commercial and multi-family projects, retainage MUST be reduced to 5% once the project reaches halfway completion to comply with state law (815 ILCS 603/20). Continuing to withhold a standard 10% after the 50% completion milestone violates the Contractor Prompt Payment Act, exposing the project to 10% annual interest penalties and granting the general contractor the legal right to legally suspend construction operations.
Statutory Deadlines
- 15 Days: Deadline for owner to pay GC (and GC to pay Sub) under the Prompt Payment Act after an invoice is approved. (815 ILCS 603/10)
- 30 Days (Accelerated Enforcement): If the owner/lender serves a formal Section 34 Demand, the lien claimant MUST file a foreclosure lawsuit within 30 days or forfeit the lien. (770 ILCS 60/34)
- 60 Days: Deadline for Subcontractors to serve preliminary notice on Owner-Occupied Single-Family projects after first furnishing labor/materials. (770 ILCS 60/21)
- 90 Days: Deadline for Subcontractors to serve Notice of Intent to Lien on All Projects after their final furnishing of labor/materials. (770 ILCS 60/24)
- 4 Months: Deadline to formally record a Mechanics Lien from the claimant’s last date of furnishing to be enforceable against third-party lenders and purchasers. (770 ILCS 60/7)
- 2 Years: Absolute statutory deadline to file a lawsuit to enforce a recorded mechanics lien, measured from the claimant’s last date of furnishing. (770 ILCS 60/9)
Mortgage Priority
Illinois presents an extreme priority risk for construction lenders due to its dual-priority framework, which blends “first-in-time” rules with a severe “enhancement value” exception.
The General Rule (Priority on the Land) Under 770 ILCS 60/1, a mechanics lien relates back and attaches as of the date of the construction contract. To establish first-lien priority over the land itself, the construction lender MUST record their mortgage prior to the date the construction contract is executed (770 ILCS 60/1).
The Enhancement Value Exception (Extreme Lender Risk) Even if the lender perfectly records the mortgage before the contract is signed or any work begins, the lender’s priority is not absolute. Under 770 ILCS 60/16, a perfected mechanics lien takes priority over a pre-existing mortgage to the extent that the labor or materials enhanced the value of the property. If the project goes into foreclosure and funds are insufficient to pay all parties, the lender’s recovery is legally limited to the value of the land before the improvements were made. The mechanic’s lien claimants have superior priority to recover from the value of the physical improvements.
Because of this enhancement rule, a recorded mortgage does not provide an impenetrable shield in Illinois. Lenders should rely heavily on rigorous draw administration, Sworn Statements, and title endorsements to mitigate this exposure.
Retainage Overview
Illinois aggressively regulates private retainage through the Contractor Prompt Payment Act, which serves as a major compliance trap for lenders unaware of the recent statutory caps.
Commercial & Multi-Family (13+ Units) For applicable private projects, 815 ILCS 603/20 enforces a strict retainage ceiling and step-down requirement. A construction contract may permit withholding up to 10% retainage prior to the completion of 50% of the contract. However, when the contract reaches 50% completion, the retainage withheld MUST be reduced so that no more than 5% is held (815 ILCS 603/20). After 50% completion, no more than 5% of any subsequent progress payments may be held. Any contract provision attempting to withhold 10% for the duration of the project violates state law.
Residential (12 or Fewer Units) Private residential construction consisting of 12 or fewer units in a single building is strictly exempt from the Prompt Payment Act retainage caps (815 ILCS 603/5). For these properties, retainage is governed entirely by the terms of the private construction contract.
Escrow Illinois does not statutorily mandate that private retainage be held in a separate, interest-bearing escrow account.
Prompt Payment Act
The Illinois Contractor Prompt Payment Act (815 ILCS 603/1 et. seq.) applies strictly to private construction contracts, explicitly exempting single-family homes and multi-family properties of 12 or fewer units.
- Owner to Prime Contractor: The owner MUST pay the contractor within 15 calendar days after the payment application is approved (815 ILCS 603/10). The payment application is statutorily deemed approved 25 days after receipt unless the owner provides a written statement detailing the withholding.
- Prime to Subcontractor: The contractor MUST pay its subcontractors within 15 calendar days of receiving payment from the owner (815 ILCS 603/10).
- Penalties & Work Stoppage (Lender Impact): If a payment is not made in a timely manner, the delinquent party MUST pay interest at a rate of 10% per annum (815 ILCS 603/15). Crucially, an unpaid contractor or subcontractor may legally suspend performance of the construction contract after providing 7 calendar days’ written notice. Draw administrators managing commercial loans should ensure maximum efficiency; unwarranted delays that breach the 15/25 day approval-to-funding window will trigger severe interest penalties and legal project shutdowns.
Title Practices
Under Illinois law, state statutes do not dictate who must administer construction loan disbursements. Lender-managed disbursements (or third-party draw administration) are legally permitted and common. The primary risk to a construction lender in Illinois does not stem from the fact that a lender or third party issues the payments, but rather from failing to obtain title endorsements that insure against the state’s severe “enhancement value” exception.
To maintain first lien priority, verifying title and clearing encumbrances at each draw is the primary best practice. While lenders can use (1) Lien monitoring subscription services or (2) Title updates (which check public records but do not provide insurance), the sheer risk profile of Illinois demands a more robust approach focused on obtaining actual title insurance.
Strategic Benefit of ALTA Endorsements: It is highly recommended that lenders utilize ALTA 32/33 equivalents (such as the Construction Loan Update Endorsement) for every disbursement. Because 770 ILCS 60/16 grants mechanics liens super-priority over the enhancement value of the property regardless of when the mortgage was recorded, standard priority rules cannot completely protect the lender. Utilizing ALTA endorsements at each draw shifts the severe risk of off-record liens and enhancement value claims from the lender to the title insurer. In order to issue these endorsements, title companies will require the presentation of a fully executed Section 5 Sworn Statement accompanied by the corresponding conditional and unconditional lien waivers. Regardless of whether the lender self-administers the draw, uses a 3rd party draw administration company, or uses a title company to facilitate the paperwork, leveraging these endorsements is crucial to mitigating risk.
Lien Waivers
Illinois does not mandate or publish specific, fill-in-the-blank statutory forms for lien waivers. However, because Illinois law strictly regulates draw disbursements using a Section 5 Sworn Statement, lenders should traditionally collect their custom lien waivers concurrently with this required affidavit at every draw to properly reconcile payments.
Lien Waiver Summary
Illinois regulates the timing and contractual enforceability of lien waivers to prevent contractor coercion.
Advance Waivers Prohibited: Under 770 ILCS 60/1(d), an agreement to waive any right to enforce or claim a lien, where the agreement is made in anticipation of and in consideration for the awarding of a contract, is void and against public policy. Blanket “no-lien” clauses signed before work begins are strictly unenforceable.
Custom Waiver Best Practices: Because the state does not prescribe statutory fill-in-the-blank forms, lenders should rely on clear, legally vetted custom waiver forms. It is highly recommended that lenders use waivers containing explicit “Through Date” language rather than ambiguous “Amount Paid” language to ensure clarity regarding the timeframe of rights being waived. It is strongly recommended as a best practice to enforce a strict draw-by-draw exchange using Conditional Waivers for the current draw amount and Unconditional Waivers for previously funded draws.
Lien Waiver Notarization
Illinois law does not dictate that the lien waivers themselves be notarized to be considered legally valid and effective. However, the accompanying Section 5 Sworn Statement MUST be a notarized affidavit (770 ILCS 60/5).
Notices
Notice of Commencement (or similar like event)
Recognized by State? No. Illinois does not utilize a recorded Notice of Commencement to establish project start dates or trigger lien filing timelines. Instead, the state relies on the Section 5 Sworn Statement to provide supply chain visibility to the owner and lender.
Preliminary Lien Notifications
Illinois utilizes specific preliminary notices to alert owners and lenders of downstream supply chain risks:
- Subcontractors (Single-Family Owner-Occupied Only): Subcontractors MUST serve a 60-Day Notice to the property owner within 60 days from their first furnishing of labor or materials (770 ILCS 60/21). Note: To fully preserve lien rights on these specific projects, residential subcontractors MUST serve BOTH the 60-Day Notice (770 ILCS 60/21) AND the standard 90-Day Notice (770 ILCS 60/24). * Statutory Warning Text: The subcontractor’s 60-day notice MUST contain the following exact warning in at least 10-point boldface type (770 ILCS 60/5(b)(ii)): “NOTICE TO OWNER: The subcontractor providing this notice has performed work for or delivered material to your home improvement contractor. These services or materials are being used in the improvements to your residence and entitle the subcontractor to file a lien against your residence if the labor, services, material, fixtures, apparatus or machinery, forms or form work are not paid for by your home improvement contractor. A lien waiver will be provided to your contractor when the subcontractor is paid, and you are urged to request this waiver from your contractor when paying for your home improvements.”
- Subcontractors & Suppliers (All Projects): Any party without a direct contract with the owner MUST serve a 90-Day Notice of Intent to Lien upon the owner and any known lender/mortgagee within 90 days after their last date of furnishing labor or materials (770 ILCS 60/24). Effective January 1, 2025, this notice MUST be served via personal delivery, USPS certified mail, or a recognized national carrier with tracking (770 ILCS 60/24).
- Implications of Failure: Failing to serve these notices within the strict statutory timelines generally invalidates the claimant’s lien rights against the owner and lender.
Notice of Completion (or similar like event)
Recognized by State? No. Illinois does not utilize a statutory Notice of Completion to truncate or alter the deadline for contractors to file mechanics liens. The deadline to record a lien against third parties is strictly four (4) months from the claimant’s last date of furnishing labor or materials, not the overall completion of the project (770 ILCS 60/7).
Section 5 Sworn Statement (Contractor’s Affidavit)
The Section 5 Sworn Statement is arguably the most critical document in the Illinois draw administration process. Under 770 ILCS 60/5, it is the duty of the general contractor to provide the owner, and the duty of the owner to demand, a written, notarized affidavit detailing the names, addresses, and amounts due (or to become due) to all parties furnishing labor or materials. The owner MUST demand this before paying any money to the contractor (770 ILCS 60/5).
- Why it is Necessary: This document dictates the exact financial status of the supply chain. Because Illinois law allows subcontractors to file liens against the property even if the general contractor has been paid in full, the owner and lender need a sworn record of who is owed what to safely disburse funds.
- Implications: If an owner or lender funds a draw without this statement, they face strict double-payment liability (770 ILCS 60/5). Funding without it strips the lender of their statutory defense against hidden sub-tier claims, meaning they do so at their own peril and risk paying twice for the same work if the GC fails to pay the subcontractors.
- Benefits: The Sworn Statement benefits the lender by providing an exact roadmap for waiver collection. By reconciling the subcontractors and balances listed on the statement against the collected conditional and unconditional lien waivers, the lender can guarantee that disbursed dollars actually extinguish the corresponding lien rights.
- Where to Obtain: Because the state does not prescribe a mandatory fill-in-the-blank template, it is highly recommended that lenders ask their title company if they have a preferred version of the Section 5 Sworn Statement. Since the title company is the entity issuing the ALTA 32/33 title endorsements and insuring against the enhancement value risk, utilizing their preferred affidavit format streamlines the endorsement process and ensures compliance with their specific underwriting guidelines.
Additional State-Specific Notices
Single Family Owner-Occupied Warning: To preserve a lien on a single-family owner-occupied residence, the general contractor MUST provide the owner with a specific, 10-point boldface warning statement explicitly advising the owner to request the Section 5 Sworn Statement before making any payments (770 ILCS 60/5(b)). The exact statutory language required is: “THE LAW REQUIRES THAT THE CONTRACTOR SHALL SUBMIT A SWORN STATEMENT OF PERSONS FURNISHING LABOR, SERVICES, MATERIAL, FIXTURES, APPARATUS OR MACHINERY, FORMS OR FORM WORK BEFORE ANY PAYMENTS ARE REQUIRED TO BE MADE TO THE CONTRACTOR.”
Section 34 Demand to Accelerate Foreclosure: To clear a clouded title, an owner or lender can serve a formal Section 34 Demand on a recorded lien claimant. Once served, the claimant MUST file suit to enforce their lien within 30 days or the lien is permanently forfeited (770 ILCS 60/34).
Document References
- Section 5 Sworn Statement (Contractor’s Affidavit): A sworn, notarized document provided by the GC to the owner before any payment is made. It lists every subcontractor, their contract amount, and balance due. It benefits the lender by providing an exact roadmap for waiver collection. If an owner/lender funds a draw without this statement, they face strict double-payment liability (770 ILCS 60/5).
- 90-Day Notice (Written Notice by Subcontractor): A warning notice sent by sub-tier claimants to the owner and lender indicating unpaid balances. It provides the lender a final opportunity to trap funds. If not sent within 90 days of last furnishing, the lien is void (770 ILCS 60/24).
- Claim for Lien: The formal encumbrance recorded with the county recorder of deeds. It MUST be recorded within four (4) months of the claimant’s last date of furnishing labor or materials to be enforceable against third-party purchasers and lenders (770 ILCS 60/7).
Contractor Licensing & Bond Requirements
Illinois does not have a centralized, statewide licensing requirement for general contractors or residential builders. General contractors are registered and licensed entirely at the local (city or county) level. For example, the City of Chicago requires general contractors to hold a license issued by the Department of Buildings.
Specialty trades are strictly regulated at the state level. Roofing contractors and plumbing contractors are regulated and licensed through the Illinois Department of Financial and Professional Regulation (IDFPR) and the Illinois Department of Public Health (IDPH), respectively.
- Surety Bonds: There is no statewide statutory bond mandate for general contractors, but local municipalities frequently request compliance bonds to issue local licenses.
- License Lookup: Lenders should verify specialty trades via the IDFPR License Lookup and verify general contractors directly with the local municipal building department.
Frequently Asked Questions
We are funding a commercial project that is 60% complete. The borrower’s private contract says we must withhold 10% retainage until the project is fully finished. Can we enforce this?
No. Because the project is commercial, it falls under the Illinois Contractor Prompt Payment Act. Under 815 ILCS 603/20, once a contract reaches 50% completion, retainage MUST be reduced so that no more than 5% is held (815 ILCS 603/20). Enforcing a 10% holdback at this stage violates state law, which subjects the owner to potential breach of contract claims and interest penalties. You should immediately reduce the retainage withholding to 5%.
The General Contractor submitted a draw request but refuses to provide a Section 5 Sworn Statement, claiming it is too much administrative work. Should we fund the draw?
Absolutely not. The state statute dictates that the owner/lender MUST demand this statement before paying any money (770 ILCS 60/5). If the draw administrator funds the GC without the Sworn Statement, and the GC subsequently fails to pay a subcontractor, the owner and lender are strictly liable to pay that subcontractor out of pocket. You should freeze the draw until a fully executed and notarized Sworn Statement is provided.
We recorded our construction mortgage two weeks before the construction contract was signed. Does this protect us entirely from mechanics liens?
It protects you regarding the land, but not the improvements. Under Illinois’s enhancement value rule (770 ILCS 60/16), a valid mechanics lien takes priority over your pre-existing mortgage to the extent that the labor or materials increased the value of the property. If the project defaults, lien claimants can recover from the value of the building structure before your mortgage recovers anything from that enhancement. You should mitigate this massive risk by utilizing Construction Loan Update Endorsements (ALTA 32/33 equivalents) prior to every disbursement.
A plumbing subcontractor served us with a 90-Day Notice of Intent to Lien. They claim they are owed $25,000, but the GC’s most recent Sworn Statement listed their balance as $0. What should the draw administrator do?
The 90-Day Notice under 770 ILCS 60/24 serves as a direct warning of an unpaid balance. Even if the GC’s Sworn Statement shows $0, the sub’s notice creates an active threat to the title. The draw administrator should immediately trap $25,000 from the GC’s current or upcoming draw and request an explanation. Funding should not resume until the dispute is resolved and an unconditional lien waiver is collected directly from the plumbing subcontractor to clear the threat.
We are funding a $150k renovation on an owner-occupied single-family home. The contractor refuses to provide a Section 5 Sworn Statement, stating that Illinois law only requires them for new ground-up construction, not remodels. Is this accurate?
No, the contractor is entirely incorrect. The Illinois Mechanics Lien Act applies to the repair or alteration of existing structures just as strictly as it does to new construction. Under 770 ILCS 60/5, the owner or lender MUST demand the written, notarized Sworn Statement before paying any money to the contractor, regardless of whether it is a new build or a renovation. The draw administrator should immediately freeze the disbursement until the statement is provided to avoid strict double-payment liability.
Our borrower’s prime contract includes a clause where the General Contractor agrees to waive all lien rights for themselves and all subcontractors before the project even begins. Does this mean we don’t need to collect draw-by-draw lien waivers?
Absolutely not. Under 770 ILCS 60/1(d), any agreement to waive a right to claim a lien made in anticipation of the contract is void and against public policy. Blanket advance “no-lien” clauses are strictly unenforceable in Illinois. The draw administrator should ignore this clause entirely and rigorously collect conditional and unconditional waivers at every progress draw to mitigate risk.
A subcontractor working on a commercial project emailed us a 90-Day Notice of Intent to Lien. They didn’t send it via certified mail or a tracking carrier. Can we ignore it since it didn’t follow strict statutory delivery methods?
While it is true that 770 ILCS 60/24 dictates that the 90-Day Notice MUST be served via personal delivery, USPS certified mail, or a recognized national carrier with tracking, you should never ignore actual knowledge of a supply chain dispute. Even if the delivery method was technically flawed, the title company will likely flag the dispute if brought to their attention, which threatens the issuance of your ALTA endorsement. As a best practice, the draw administrator should immediately trap the disputed funds and demand a clear conditional or unconditional waiver from that subcontractor before resuming disbursements.
A roofing subcontractor recorded a mechanics lien on a multi-family project five months ago. They are ignoring all requests to settle or release the lien, which is blocking our final draw. How can we force a resolution?
The owner or lender should serve a formal Section 34 Demand to Accelerate Foreclosure. Under 770 ILCS 60/34, once this formal written demand is served upon the lien claimant, the claimant MUST file a lawsuit to enforce their lien within 30 days. If the subcontractor fails to file suit within that strict 30-day window, the lien is permanently forfeited. This mechanism allows the title company to subsequently clear the encumbrance and the lender to safely proceed with the final draw.
We are administering an FHA 203(k) renovation loan. The HUD consultant has not been collecting the Section 5 Sworn Statement or corresponding lien waivers, stating that the generic lien waiver generated by their inspection software is allowable by HUD. Is this acceptable in Illinois?
No, this is highly dangerous and unacceptable in Illinois. While a generic waiver might satisfy a minimum federal HUD guideline, it does not supersede state law or protect the lender’s lien priority against state-level encumbrances. Under 770 ILCS 60/5, the owner/lender MUST demand the notarized Section 5 Sworn Statement before making any payments. If the lender funds the HUD consultant’s generic draw request without the Sworn Statement and reconciled subcontractor waivers, the lender will face strict double-payment liability if any downstream trades go unpaid. The draw administrator should immediately instruct the HUD consultant that Illinois state law supersedes software defaults and require the proper Section 5 affidavit before authorizing the next disbursement.
On the record
Statutes and disclaimer
State statute reference
- State statute
- Illinois Mechanics Lien Act, 770 ILCS 60/0.01 et. seq.
- State statute
- Contractor Prompt Payment Act, 815 ILCS 603/1 et. seq
- Last statutory change
- 2025 — House Bill 4660: Modernizing delivery of the subcontractor 90-day notice under 770 ILCS 60/24
- Reviewed
- April 18, 2026 by Land Gorilla
Disclaimer
Information on this website is provided for informational purposes only and is not intended to be legal advice or establish an attorney-client relationship. Construction law can change at any time, so the information on this website may not be the most up-to-date information available. The information on this website is posted “as is” and no representations are made that the content is without errors. Use of this website does not create an attorney-client relationship between Land Gorilla, content creators, law firms, and any other contributors to this website. Users of this website should contact their own legal counsel for advice with respect to any legal matters.