Indiana Construction Lending Requirements

Commercial loans get a statutory safe harbor here; residential ones get none — and a no-lien contract can shut sub-tier liens off entirely.

Reviewed April 26, 2026Last statutory change 2021 · Amendments to IC 32-28-3Statutes and disclaimer

  • Priority over prior mortgageCan relate back

  • Statutory waiver formNot statutory

  • Notice of commencementNot recognized

  • Contractor licensingGC licensing is local only

  • Preliminary noticeRequired (residential)

  • RetainageBy contract

What a construction lender needs to know about Indiana

Indiana at a glance

Indiana’s lien rules turn heavily on building class. On Class 2 residential (1–2 family), a no-lien contract signed by the owner and general contractor and recorded within five days of execution — before any sub-tier furnishes anything — is an absolute bar that extinguishes every subcontractor’s lien right, making downstream waivers unnecessary. Priority also splits: commercial and multi-family (3+ units) work gets a safe harbor protecting loan proceeds actually used in the project even if some work began before recording, while Class 2 residential is strict first-in-time and requires sub-tier preliminary notices that commercial work does not. Retainage and payment terms are entirely by contract — no statutory cap and no private prompt-pay act.

Class 2 or Class 1 decides notice and priority.

Indiana sorts property into Class 2 — strictly 1 to 2 family dwellings — and Class 1, meaning commercial and multi-family of three units or more. Notice duties, priority rules, and the availability of a no-lien contract all turn on that classification. Engineers, surveyors, and architects hold the same lien rights as the trades.

First question on every file: is this a Class 2 dwelling?

Class 2 · 1 to 2 family
Sub-tiers must serve preliminary notice. No-lien contracts available.
Class 1 · commercial, 3+ units
No sub-tier notice owed. Statutory mortgage safe harbor applies.

The safe harbor covers commercial, not houses.

On commercial and multi-family work, a construction mortgage outranks every lien recorded after it, to the extent the proceeds were actually used in the project — so some early work does not necessarily sink you.

That subsection does not reach Class 2 residential. There, priority is strict first-in-time: record before any visible labor or materials, or the liens relate back and share parity with or leapfrog you.

Commercial and multi-familySafe harbor for proceeds used in the project
Class 2 residentialStrict first-in-time, no safe harbor
Record beforeAny visible labor or materials
Cover the gapTitle endorsements, each draw

The no-lien contract, and the blind spot beside it.

On Class 2 residential work Indiana permits a no-lien contract — a powerful risk-mitigation tool. Use it where you can.

The flip side is the commercial file: subs and suppliers owe no preliminary notice on commercial, multi-family, or non-owner-occupied residential work, so unknown claimants can appear with no warning at all.

No-lien contract, Class 2
Available on 1 to 2 family dwellings, and worth pursuing at closing.
Commercial has no early warning
No sub-tier notices, so get a master subcontractor list from the GC and collect trailing waivers from major trades at each draw.
Reject contractor waiver forms
Contractor-supplied waivers routinely preserve delay claims or run to third parties. Use your own.

No statutory form, so scrutinize every one you receive.

Waiver language is a matter of contract law here, subject to the statutory limits on advance waivers. Contractor-provided forms are frequently watered down — drafted to preserve claims rather than release them.

Standardize on your own vetted templates and run the draw-by-draw exchange.

  • Conditional · current draw
  • Unconditional · previous draw

No private prompt payment act, no retainage cap.

Indiana’s prompt payment statute is public works only. On private work, payment timing, frequency, and penalties come entirely from the prime contract, and retainage is uncapped with no escrow requirement.

Hold standard retainage anyway — it is your leverage to ensure completion.

RetainageBy contract, uncapped
EscrowNot required
Payment deadlinesPrime contract only
LicensingLocal; plumbers licensed by the state

Indiana Lien Law Overview

Indiana’s mechanics lien laws provide a statutory remedy for contractors, subcontractors, mechanics, lessors of equipment, and material suppliers to secure payment for labor or materials furnished for the improvement of real property. Additionally, under IC § 32-28-11-1, registered professional engineers, land surveyors, and architects have the exact same lien rights as traditional contractors for services rendered. The statutes create a strict framework heavily reliant on the property type.

The most critical distinction in Indiana law is between residential properties (Class 2 structures: strictly defined as 1-2 family dwellings) and all other property types (Class 1 structures: commercial, 3+ unit multi-family). For Class 2 residential dwellings, sub-tier claimants are statutorily required to serve advance preliminary notices to preserve their lien rights (IC § 32-28-3-1), and lenders have the unique ability to utilize “No-Lien Contracts.” For commercial and multi-family projects, no preliminary notice is required from subcontractors, creating a severe “hidden lien” risk for commercial lenders.

Mortgage Priority

Indiana utilizes a “relation-back” doctrine for mechanics liens, but establishes drastically different priority rules based on the property type (IC § 32-28-3-5).

  • Commercial & Multi-Family (Statutory Priority): Under IC § 32-28-3-5(d), a commercial construction mortgage has priority over all mechanics liens recorded after the date the mortgage was recorded, strictly to the extent of the loan proceeds actually utilized in the project. This acts as a safe harbor, protecting the commercial lender’s advanced funds even if some work commenced prior to recording.

  • Residential 1-2 Family (Strict Relation-Back): The safe harbor in subsection (d) does not apply to Class 2 residential construction (1-2 family dwellings). For residential loans, priority is strictly “first-in-time.” A residential construction mortgage must be recorded before any visible labor or materials are furnished to the site to establish first-lien priority. If work commences before the mortgage is recorded, subsequent mechanics liens relate back to that commencement date and will share parity with or leapfrog the mortgage (IC § 32-28-3-5(b)).

  • The “No-Lien Contract” (Residential Absolute Priority): The most effective way a residential construction lender can guarantee absolute senior priority and eliminate the threat of sub-tier mechanics liens altogether is if a “No-Lien Contract” is properly executed and recorded (IC § 32-28-3-1).

  • Timing & Mortgage Relationship: To successfully block sub-tier liens, the No-Lien Contract must be executed before any sub-tier labor or materials are furnished to the property. Once executed, it must be recorded in the county recorder’s office not more than five (5) days after the date of execution (IC § 32-28-3-1(f)). As a lender best practice, this contract should be executed at or immediately prior to the loan closing and recorded concurrently with the construction mortgage to ensure both protective documents are publicly filed before physical construction commences.

  • Responsibility: The property owner and the principal general contractor must sign the agreement, but it is typically the responsibility of the owner (or the title company/lender acting on the owner’s behalf at closing) to ensure it is formally recorded in the county recorder’s office within that strict 5-day window.

  • Benefits: For the lender and owner, this acts as an absolute legal bar against any subcontractor, material supplier, or laborer filing a mechanics lien against the property. It provides total immunity from downstream payment disputes and ensures the lender’s mortgage remains in an undisputed first-lien position. Because the sub-tier lien rights are legally extinguished by this public record, the lender is legally exempt from needing to collect downstream lien waivers from subcontractors or suppliers to protect their collateral.

  • Implications: If the contract is not recorded strictly within the 5-day statutory window, or if it lacks a precise legal description or proper notarization, the no-lien provision is entirely void against third parties. If voided, the lender loses this absolute shield, the standard residential “parity” rules apply, and the property becomes exposed to hidden sub-tier liens.

Retainage Overview

Indiana regulates retainage entirely differently depending on whether the project is public or private.

Residential (1-2 family), Multi-Family (3+ units), & Commercial (Private Projects): Indiana does not impose a statutory cap on the percentage of retainage that can be withheld on private construction projects, nor does it dictate a statutory release timeline. The amount of retainage withheld (typically 5% to 10%) and the conditions for its release are governed strictly by the terms of the private construction contract between the owner and the general contractor. Furthermore, there is no statutory mandate to hold private retainage in an interest-bearing escrow account.

Lender Best Practice: Lenders should firmly align their loan holdbacks with the private construction contract’s retainage provisions. Maintaining standard retainage withholding provides essential financial leverage to ensure project completion.

Prompt Payment Act

Indiana does not have a Private Prompt Payment Act.

Residential (1-2 family), Multi-Family (3+ units), & Commercial: Payment deadlines, frequency, and penalties for late payments on private construction projects are dictated entirely by the terms of the negotiated construction contract. While Indiana has a robust Prompt Payment statute (IC § 5-17-5-1 et. seq.), it strictly applies only to public works and state agency contracts. Draw administrators managing private loans should rely exclusively on the specific payment timelines negotiated in the borrower’s prime contract to avoid breach of contract claims that could trigger work stoppages.

Title Practices

Under Indiana law, state statutes do not require title companies to administer construction loan disbursements; therefore, lender-managed disbursements (or third-party draw administration) represent the standard industry practice.

To maintain first lien priority, verifying title and monitoring for liens at each draw is the primary best practice. Construction lenders have three primary options to achieve this: (1) Lien monitoring subscription services, (2) Title updates (which check public records but do not provide insurance), and (3) Title endorsements (which provide actual insurance to the lender).

Strategic Benefit of ALTA Endorsements: Because Indiana employs a relation-back doctrine where liens revert to the date work commenced, it is highly recommended that construction lenders utilize ALTA 32 (Construction Loan) and ALTA 33 (Disbursement) title endorsements. Relying solely on uninsured title updates leaves the lender exposed to off-record “gap” liens. Obtaining these endorsements actively shifts the severe risk of intervening liens from the lender to the title insurer. Regardless of the method chosen, leveraging these tools to clear encumbrances and verify public filings prior to releasing every single draw is crucial to mitigating risk.

Lien Waivers

Indiana does not mandate or publish specific, fill-in-the-blank statutory forms for lien waivers. The format and language of lien waivers are governed by standard contract law, subject to strict statutory restrictions regarding advance waivers.

Operational Warning: Draw Administrators should strictly reject or highly scrutinize any lien waiver forms provided by the general contractor or subcontractors. Contractor-provided forms frequently contain watered-down language, attempt to preserve delay claims, or are drafted to the benefit of third parties rather than the lender. Lenders should ideally utilize their own legally vetted, standard waiver templates.

Lien Waiver Summary

Indiana law strictly regulates the timing and validity of waivers depending on the property type.

  • The “No-Lien Contract” (Residential Safe Harbor): Under IC § 32-28-3-1(e), Indiana offers a uniquely powerful risk-mitigation tool for Class 2 residential construction (1-2 family dwellings). An owner and principal contractor may stipulate in their contract that no lien shall attach to the real estate. To be legally valid against subcontractors and suppliers, this “No-Lien Contract” must: (1) be in writing, (2) contain a specific legal description of the real estate, (3) be notarized (acknowledged), and (4) be recorded in the county recorder’s office not more than five (5) days after execution (IC § 32-28-3-1(f)). Lenders funding residential construction should strongly encourage the borrower to execute and record a No-Lien Contract prior to construction commencing, as it is the only way to entirely eliminate mechanic’s lien exposure and establish true senior priority on a residential loan. If successfully recorded, the lender is legally exempt from needing to collect sub-tier lien waivers, though they should still collect routine progress waivers from the General Contractor to maintain a payment paper trail.
  • Advance Waivers Prohibited (Commercial & Multi-Family): For all commercial and multi-family projects (Class 1 structures), advance lien waivers are strictly void. Under IC § 32-28-3-16(b), any provision in a commercial contract that requires a person to waive their right to a mechanics lien before they are actually paid is void and legally unenforceable against public policy.
  • Lender Best Practice (Progress Waivers): Because advance blanket waivers are void on commercial projects, lenders should utilize heavily vetted, custom waiver forms and enforce a strict draw-by-draw exchange. Lenders should exclusively collect Conditional Waivers for the current draw request (expressly conditioned on the receipt and clearance of funds) and Unconditional Waivers for previously funded draws to legally and definitively prove the satisfaction of debt.

Lien Waiver Notarization

Indiana law does not require lien waivers to be notarized to be considered legally valid and effective. A signed, written agreement is sufficient. (Note: The actual “Notice of Intention to Hold Lien” filed with the county recorder must be a sworn statement per IC § 32-28-3-3, but standard progress/final waivers collected by the lender do not require notarization).

Notices

Notice of Commencement (or similar like event)

Indiana DOES NOT utilize a recorded Notice of Commencement for private construction projects to establish project start dates or trigger lien filing timelines. Priority is strictly determined by the actual, physical commencement of work and the recording date of the construction mortgage.

Preliminary Lien Notifications

Indiana imposes strict preliminary notice requirements, but they are entirely dependent on the property classification.

Commercial, Multi-Family (3+ Units), & Non-Owner-Occupied Residential: Subcontractors and suppliers are not required to send preliminary notices. This creates a severe blind spot for commercial lenders, as unknown sub-tier parties can file liens without ever providing an early warning.

Owner-Occupied Residential (Class 2: 1-2 Family Dwellings): Any party selling or furnishing materials or labor to someone other than the owner (e.g., a subcontractor working for the GC) is required to furnish a written notice of delivery or work and of the existence of lien rights to the occupying owner.

  • New Construction: This notice must be sent to the owner, and a copy filed in the county recorder’s office, not later than 60 days after the date of first delivery or labor performed, regardless of current occupancy (IC § 32-28-3-1(i)).
  • Alteration/Repair: This notice must be sent to the owner not later than 30 days after the date of first delivery or labor performed, and is strictly only required if the dwelling is currently owner-occupied (IC § 32-28-3-1(h)).

Implications of Failure: The furnishing of this notice is a strict condition precedent; if a claimant fails to provide it within the statutory timeframe, they permanently forfeit their right to acquire a lien against the residential property.

Notice of Completion (or similar like event)

Indiana DOES NOT utilize a statutory Notice of Completion to truncate or alter the deadline for contractors to file mechanics liens. The lien filing window is strictly dictated by the claimant’s last date of furnishing labor or materials.

Additional State-Specific Notices

Personal Liability Notice (Notice to Owner to Withhold Funds): Under IC § 32-28-3-9, any subcontractor, journeyman, or laborer employed by the general contractor may give the property owner a written notice indicating the amount due to them from the general contractor. Upon receiving this notice, the owner becomes personally liable to the claimant for the amount owed, up to the balance the owner still owes the general contractor. For the lender, this acts as a statutory “fund-trapping” mechanism. If this notice is received, the lender and owner should immediately freeze the disputed funds from the GC’s draw to prevent double-payment liability.

Strict Filing & Foreclosure Deadlines: To perfect a lien, a claimant must file a sworn statement and Notice of Intention to Hold Lien in the county recorder’s office (IC § 32-28-3-3).

  • For Class 2 structures (residential 1-2 family dwellings), the lien must be filed within 60 days after the last furnishing (IC § 32-28-3-3).
  • For all other properties (Class 1 structures, including commercial and multi-family apartments), the lien must be filed within 90 days after the last furnishing (IC § 32-28-3-3).
  • Foreclosure Deadline: Under IC § 32-28-3-6, a claimant must file a complaint to foreclose the lien within one (1) year of recording the notice. If not filed, the lien is statutorily void. Furthermore, successful lien claimants are statutorily entitled to recover mandatory attorney’s fees (IC § 32-28-3-14), making unresolved liens highly expensive.

Statutory Lien Discharge (Bonding Off): Under IC § 32-28-3-11, if a lien is filed, any person having an interest in the property (including a mortgagee/lender) may file a written undertaking (a surety bond) approved by the court to immediately release the property from the lien. While the statute only strictly requires a court-approved surety bond conditioned on the payment of any judgment (IC § 32-28-3-11), standard title underwriting and lender best practices highly recommend requiring a bond issued by an “A-” rated surety equal to at least 150% of the lien amount. This 150% overlay is strategically recommended to satisfy title insurers and cover the mandatory attorney’s fees awarded to successful lien claimants under IC § 32-28-3-14. This is a critical remedy for lenders to clear title and keep project funding moving while a dispute is litigated.

Document References

  • No-Lien Contract (Class 2 Residential Only): A proactive contract filed between the owner and GC before work begins that legally bars sub-tier mechanics liens on 1-2 family dwellings. Highly beneficial to residential lenders to eliminate lien risk entirely. Must be recorded within 5 days of execution (IC § 32-28-3-1(e)).
  • Notice of Furnishing (Residential Preliminary Notice): A statutory notice sent by subcontractors/suppliers on 1-2 family dwellings. It provides the owner and lender critical early visibility into downstream payees. If not sent within 30 days (owner-occupied repairs) or 60 days (new builds) of first work, the claimant’s residential lien rights are voided (IC § 32-28-3-1).
  • Personal Liability Notice: A written notice from an unpaid subcontractor to the owner. It benefits the lender by signaling a breakdown in the payment chain, forcing the trapping of funds to prevent double liability (IC § 32-28-3-9).

Notice of Intention to Hold Lien:

The formal, sworn document recorded in the county recorder’s office to perfect the encumbrance. It establishes the bounds of the claim. Must be filed within 60 days (residential) or 90 days (commercial/multi-family) of last furnishing (IC § 32-28-3-3).

Contractor Licensing & Bond Requirements

Indiana utilizes a highly localized licensing framework for general contractors, with the state primarily regulating specific specialty trades.

  • General Contractors: The State of Indiana does not require a statewide license for general contractors or residential homebuilders. Licensing, bonding, and insurance requirements are dictated entirely at the local municipal or county level (e.g., the City of Indianapolis requires contractors to hold a Consolidated City of Indianapolis license, carry minimum general liability insurance, and post a $10,000 surety bond).
  • Specialty Trades: Plumbers are statutorily required to be licensed at the state level by the Indiana Plumbing Commission (IC § 25-28.5).
  • License Lookup: Because general contracting is managed locally, lenders should verify general contractors directly with the applicable city or county building department. For state-regulated plumbers, lenders should use the official Indiana Professional Licensing Agency (IPLA) Search Portal.

Frequently Asked Questions

We are preparing to close a residential 1-unit construction loan. Does our mortgage automatically have first priority if we record it?

No, not automatically. Under Indiana IC § 32-28-3-5, a residential construction mortgage only gains priority if it is recorded before any mechanic begins to perform labor or furnish materials. If the general contractor starts moving dirt or delivering lumber before your mortgage is recorded, subsequent mechanics liens will relate back to that physical commencement and share parity with or leapfrog your mortgage. To guarantee first-lien priority and completely block subcontractor liens on a Class 2 residential property, the owner and GC should execute a “No-Lien Contract” before construction begins, and it must be recorded within 5 days of execution (IC § 32-28-3-1(f)). Best practice is recording it concurrently with the mortgage at closing.

We are funding a custom 1-unit residential home build. Is there any way to proactively block subcontractors from filing mechanics liens entirely?

Yes. Under IC § 32-28-3-1(e), Indiana permits the use of a “No-Lien Contract” for Class 2 residential properties. If the owner and principal contractor sign an agreement stating no liens shall attach to the property before work begins, and this contract is notarized with a legal description and recorded in the county recorder’s office within 5 days of execution, it acts as an absolute bar against all subcontractor and supplier mechanics liens. The lender should make the execution and concurrent recording of this contract a pre-closing condition.

The General Contractor’s commercial contract contains a clause stating they waive all lien rights for themselves and their subcontractors upfront. Can we rely on this to avoid collecting draw-by-draw lien waivers?

Absolutely not. Under IC § 32-28-3-16(b), a provision in a commercial contract for the improvement of real estate that requires a person to waive their right to a mechanics lien before they have been actually paid for the labor or materials is void and completely unenforceable. Relying on an advance “no-lien” clause provides zero legal protection in Indiana. The lender should implement a disciplined trailing waiver process, collecting conditional waivers for current draws and unconditional waivers once payments have cleared.

A roofing subcontractor just filed a Notice of Intention to Hold Lien on our commercial project, and the title company is refusing to issue our ALTA 33 endorsement for the next draw. How can we keep the project funded?

You do not have to wait for a lengthy lawsuit to conclude. Under IC § 32-28-3-11, any party with an interest in the property (including the owner or lender) can file a written undertaking (a surety bond) with the court to discharge the lien. While the statute strictly only requires a court-approved bond, the lender should instruct the borrower or general contractor to immediately bond off the lien using an “A-” rated surety for at least 150% of the lien amount to satisfy standard title underwriting requirements and cover potential attorney’s fee awards under IC § 32-28-3-14. Once filed and approved, the property is statutorily discharged from the lien so that title is cleared and the next draw can be insured and funded.

We are funding a large commercial retail build. How long do we have to wait after the project is finished before the threat of a mechanics lien has passed?

For commercial and multi-family projects (Class 1 structures), Indiana law dictates a strict 90-day filing window. Under IC § 32-28-3-3(a), a claimant must record their sworn statement and Notice of Intention to Hold Lien not later than ninety (90) days after their last furnishing of labor or materials. Because subcontractors on commercial projects are not required to send preliminary notices, you will have no early warning of these claims. You should wait until the 90-day window expires and verify clean title via a date-down endorsement before releasing final retainage.

Statutes and disclaimer

State statute reference

State statute
Indiana Code (IC) Title 32, Article 28, Chapter 3 (Mechanic’s Liens), IC § 32-28-3-1 et. seq.
Last statutory change
2021 — Amendments to IC 32-28-3: Clarifying mechanics lien filing procedure and electronic recording
Reviewed
April 26, 2026 by Land Gorilla

Disclaimer

Information on this website is provided for informational purposes only and is not intended to be legal advice or establish an attorney-client relationship. Construction law can change at any time, so the information on this website may not be the most up-to-date information available. The information on this website is posted “as is” and no representations are made that the content is without errors. Use of this website does not create an attorney-client relationship between Land Gorilla, content creators, law firms, and any other contributors to this website. Users of this website should contact their own legal counsel for advice with respect to any legal matters.