Skip to content

Ohio Construction Lending Requirements

Record the mortgage, then the notice of commencement — in that order, before anyone sets foot on site.

Reviewed May 7, 2026Last statutory change 2025 · House Bill 96Statutes and disclaimer

  • Priority over prior mortgageCan relate back

  • Statutory waiver formNot statutory

  • Notice of commencementRequired (non-home)

  • Contractor licensingLocal registration

  • Preliminary noticeNotice of furnishing

  • RetainageBy contract

Download state documents

What a construction lender needs to know about Ohio

Ohio at a glance

Ohio runs two priority frameworks side by side. Under § 1311.13, work furnished before a notice of commencement is recorded can relate back to the first visible work, while work after it relates to the notice’s recording date — but § 1311.14 gives a qualifying construction mortgage its own priority framework that controls over the other lien provisions and is construed liberally in favor of a mortgagee that substantially complies, so early work is a real concern but not automatically fatal. The mortgage has to carry the required covenant and mortgagee information, fund the improvement or permitted prior encumbrances, and disburse in substantial compliance with the statutory order; and if the mortgage and the notice of commencement record the same day, the mortgage is treated as first. On home construction contracts a residential owner has a payment-in-full defense — a sub can’t lien where the owner paid the GC in full before receiving the lien affidavit — and the lender’s own protection turns on the original contractor’s affidavit procedure. Retainage is uncapped and contract-governed.

Home construction contracts run on their own track.

Ohio uses a notice of commencement and notice of furnishing system for most private improvements, but home construction contracts are carved out. On those, the notice of furnishing requirement does not apply — and a residential owner who pays the original contractor in full before receiving a lien affidavit has a defense against sub-tier liens.

First question on every file: is this a home construction contract as the statute defines it?

Home construction contract
Payment in full is a defense. No notice of furnishing.

Two frameworks, and recording sequence matters in both.

Work furnished before a notice of commencement is recorded can relate back to the first visible work. Work after it takes the notice’s recording date. Separately, a construction mortgage may have its own priority over liens filed after it records, if it carries the required mortgagee information and covenant and the funds are used and disbursed as the statute requires.

If mortgage and notice record the same day, the mortgage is treated as first — but control the sequence anyway and confirm it with title.

No notice recorded yetLiens may relate back to first work
Notice recordedLiens take its recording date
Same-day recordingMortgage deemed first

On a home construction contract, the affidavit comes before the money.

The original contractor’s affidavit — the sworn statement — is a statutory condition of disbursement on home construction contracts. Once you hold it, you may rely on it unless it is fraudulent on its face, and you are not liable for payments made in reliance absent gross negligence or fraud.

No affidavit, no payment
Do not pay an original contractor on a home construction contract until the affidavit is in hand.
It is your statutory shield
Reliance on the affidavit is protected unless it appears fraudulent on its face or you act with gross negligence or fraud.
Collect one anyway on commercial
Not mandated on commercial or multi-family, but an equivalent sworn statement is a lender best practice to map the supply chain.

No statutory form, and some waivers the statute simply voids.

Ohio publishes no waiver form, so enforceability is contract and fact dependent. Two statutes cut through whatever the contract says: prompt payment interest, attorney fees, and costs cannot be waived, and certain clauses — waiving bond rights, waiving an asserted claim by reason of final payment, out-of-state forum terms, and pay-if-paid bars on filing a timely lien — are void outright.

  • Conditional · current draw
  • Unconditional · cleared amounts
  • Final waiver at closeout
  • Updated contractor affidavit

The lien clears on the court’s entry, not on the filing.

An owner, contractor, or any interested party can substitute a bond or cash for the property — double the claim at $5,000 or less, 1.5 times above that — but it takes court approval, and the property is discharged only as of the court’s entry. Wait for title confirmation before you resume funding.

You also have an offensive move: serve a notice to commence suit and the lienholder has 60 days to sue or the lien is void. Recorded liens otherwise live six years.

Claim $5,000 or lessBond at 2× the claim
Claim over $5,000Bond at 1.5×
Notice to commence suit60 days or the lien is void

Ohio Construction Lending Documents Kit

  • The package includes the following:
  • Notice of Commencement — ORC 1311.04
  • Original Contractor’s Affidavit — ORC 1311.011(B)(4)
  • Owner’s Affidavit of Full Payment — ORC 1311.011(B)(1)

Disclaimer: These forms are provided for informational purposes only and are not intended to be legal advice or establish an attorney-client relationship. They are posted ‘as is’ and we do not warrant that they are the most current version. Users of these forms should consult their legal counsel before using for their particular transaction.

Ohio Construction Lien Law Overview

Ohio’s mechanics lien laws (ORC Chapter 1311) provide a statutory right for original contractors, subcontractors, material suppliers, and laborers to secure payment for work performed or materials furnished to improve real property.

For many non-home private improvements, Ohio uses a structured Notice of Commencement and Notice of Furnishing system.

Ohio’s Notice of Commencement / Notice of Furnishing structure applies differently depending on project type, and home construction contracts are treated separately. For home construction contracts, ORC § 1311.04 does not generally apply except when a lending institution requires a Notice of Commencement as part of financing. If such a Notice of Commencement is recorded, ORC § 1311.13 priority rules apply, but ORC § 1311.05 Notice of Furnishing requirements do not apply (ORC § 1311.04(O)).

For residential properties (“home construction contracts” as defined by ORC § 1311.011), ORC § 1311.011 provides separate residential owner and lender protections. Subcontractors and suppliers cannot obtain a valid mechanics lien if the owner has paid the original contractor in full before the owner receives a copy of the mechanics lien affidavit, subject to the statutory fraud exception (ORC § 1311.011(B)(1)). This payment-in-full defense can protect the residential owner and property from later sub-tier liens if the statutory conditions are satisfied. A lender’s separate statutory protection depends on compliance with the original contractor affidavit and payment procedures in ORC § 1311.011(B)(4)-(8), including reliance on an affidavit that is not fraudulent on its face and avoiding gross negligence or fraud. Commercial projects do not share this residential payment-in-full defense, exposing commercial owners and lenders to broader lien-priority, title, and disbursement risk.

Mortgage Priority and Construction Loan Priority

Ohio mechanics lien priority should be analyzed under two related but distinct statutory frameworks.

  • Relation-Back Doctrine (ORC § 1311.13): First, ORC § 1311.13 governs mechanics lien attachment, continuance, and priority. For work or materials furnished before a Notice of Commencement is recorded, mechanics lien priority may relate back to the first visible work, labor, or materials furnished at the site. For work or materials furnished after a Notice of Commencement is recorded, lien priority generally relates to the recording date of the Notice of Commencement, subject to statutory exceptions, including special treatment for laborer liens.
  • Same-Day Recording Rule: Unless the mortgage states otherwise, if a construction mortgage and Notice of Commencement are recorded on the same day, the mortgage is considered recorded before the Notice of Commencement for priority purposes (ORC § 1311.13(G)). Lenders should still control the recording sequence as a best practice and obtain title confirmation.
  • Construction Mortgage Priority (The Safe Harbor): Second, ORC § 1311.14 provides a separate construction mortgage priority framework. A mortgage given in whole or in part to improve real estate or pay off prior encumbrances may have priority over mechanics liens filed after the construction mortgage is recorded, to the extent the mortgage contains the required mortgagee information and covenant, the proceeds are used for the improvement or permitted prior encumbrances, and the mortgagee disburses the mortgage fund in substantial compliance with the statutory order. ORC § 1311.14 states that it controls over other mechanics lien provisions for qualifying construction mortgages and is liberally construed in favor of mortgagees that substantially comply.
  • Lender Best Practice: For lender risk management, visible work, site preparation, demolition, or material delivery before mortgage recording remains a serious underwriting and title concern. It can create ordinary relation-back priority risk under ORC § 1311.13 and may create title insurer exceptions or closing conditions. However, it should not be described as an automatic loss of construction mortgage priority where ORC § 1311.14 applies. The lender should confirm that the mortgage qualifies as a construction mortgage, that the mortgage includes the required statutory covenant and mortgagee information, that proceeds are used for the improvement or prior encumbrances, and that each disbursement complies with ORC § 1311.14 and title insurer requirements.

Retainage Overview

Ohio law does not statutorily regulate or cap the amount of retainage that can be withheld on private construction projects.

  • Private Projects: For residential, multi-family, and commercial private projects, the percentage of retainage withheld and the timeline for its release are governed entirely by the terms of the private construction contract between the owner and the prime contractor.
  • Escrow: There is no statutory mandate in Ohio requiring private retainage to be held in a separate, interest-bearing escrow account.
  • Prompt Payment Impact: For covered non-excluded projects, downstream retainage payments from contractors to subcontractors, suppliers, lower-tier parties, and laborers may also be subject to ORC § 4113.61 timing and interest rules.
  • Lender Best Practice: Lenders should align their internal holdbacks closely with the borrower’s prime contract to maintain financial leverage and ensure project completion. (Note: Ohio does cap retainage on public works projects, but those provisions do not apply to private lending).

Prompt Payment Act

The Ohio Prompt Payment Act, ORC § 4113.61, primarily governs downstream payments from contractors to subcontractors, material suppliers, lower-tier parties, and laborers after the upstream party receives payment. For covered projects, payment generally must be made within 10 calendar days after receipt of payment, subject to statutory conditions, retainage provisions, disputed claims, and exclusions.

  • Exclusions: The statute expressly does not apply to construction or improvement of single-, two-, or three-family detached dwelling houses.
  • Penalties: Late covered payments accrue interest at 18% per annum. In a civil action to enforce the statute, the court shall award the prevailing party reasonable attorney fees and court costs unless the court determines that such an award would be inequitable.
  • Lender Risk Implications: Even where the statute does not directly regulate the lender or owner-to-prime timing, draw delays can still create project, lien, and completion risk.

Title Practices

Under Ohio law, state statutes do not require title companies to administer construction loan disbursements. Lender-managed disbursements (or third-party draw administration) represent the standard industry practice.

To monitor lien risk and preserve priority for future advances, verifying title at each draw is a primary lender best practice. Construction lenders should use title updates, title endorsements, or title-monitoring services as part of their draw-control process.

  • Strategic Benefit of Title Endorsements: As a lender best practice, lenders should consider ALTA 32 (Construction Loan) and ALTA 33 (Disbursement) title endorsements (or their equivalents). ALTA 32/33 or equivalent endorsements do not guarantee absolute protection; coverage is subject to policy language, exceptions, exclusions, title insurer underwriting, and date-down requirements.

Lien Waivers

Ohio does not publish mandatory statutory lien waiver forms, and lien waiver enforceability should be treated as contract- and fact-dependent. Ohio law does not impose a general notarization requirement for lien waivers.

  • Statutory Restrictions: Lenders should avoid relying on broad advance lien waivers or final-payment language without Ohio counsel review. ORC § 4113.61 prohibits waiver of statutory prompt-payment interest, attorney fees, and court costs. ORC § 4113.62 also voids certain construction contract provisions, including provisions waiving surety bond rights, provisions that waive a pending or asserted claim by reason of final payment after notice of the claim, certain out-of-state law/forum provisions for Ohio construction work, and payment-contingent provisions that prohibit a party from filing a timely lien or bond claim to preserve rights.
  • Lender Best Practice: Use a draw-by-draw waiver process. Collect conditional progress waivers for current draw amounts, unconditional waivers for amounts actually paid and cleared, final waivers at closeout, and updated contractor affidavits identifying unpaid claims. Custom waiver forms should be reviewed by Ohio counsel.

The Original Contractor’s Affidavit (Sworn Statement)

The Original Contractor’s Affidavit (often referred to as a Sworn Statement) is a critical document in Ohio construction lending, governed heavily by ORC § 1311.011 for residential projects.

  • Applicability (Residential vs. Commercial)
  • Residential/Home Construction: Under ORC § 1311.011(B)(4), this affidavit is a statutory mandate for “home construction contracts” (single- and double-family dwellings and residential condominium units). This applies to original construction, alterations, repairs, and renovations falling under that definition.
  • Commercial/Multifamily: For commercial, multi-family rental, or non-residential projects, Ohio law does not statutorily mandate this specific affidavit as a condition of disbursement, but collecting an equivalent sworn statement is a universal lender best practice to map the project’s supply chain.
  • Impact on Construction Lenders: For residential home construction contracts, the affidavit is the cornerstone of the lender’s statutory protection. The lender may legally rely on the affidavit unless it appears fraudulent on its face. The lender is not financially liable for payments made in reliance on the affidavit except in cases of lender gross negligence or fraud.
  • Required Draw Practices: For applicable home construction contracts, no lending institution should make payment to an original contractor until the contractor provides the affidavit. The draw administrator must verify that the affidavit states the original contractor has paid in full for all labor, work, and materials furnished during the applicable period, except for unpaid claims specifically identified by claimant and amount. The lender should verify that the math on the affidavit matches the draw request and that conditional/unconditional waivers are collected for the identified parties.
  • Benefits and Implications
  • Benefit: Collecting the affidavit properly supports the residential “payment-in-full” defense, shielding the property and the lender from subsequent mechanics liens for amounts already disbursed to the original contractor.
  • Implications of Missing: Disbursing funds to the original contractor on a home construction contract without obtaining the required affidavit may violate the statutory residential payment process. Furthermore, after the lender receives written notice of a claim of lien rights from a sub-tier party, failure to obtain a lien release from that claimant before disbursing further funds is prima facie evidence of gross negligence, exposing the lender to double-payment liability.

Notices

Notice of Commencement / Notice of Contract / Equivalent

  • Recognized by State? Yes (Notice of Commencement).
  • Who Files: The property owner, part owner, or lessee. (If the owner fails to file, an original contractor or mortgagee may record it on the owner’s behalf, subject to ORC § 1311.04(N)‘s timing, demand, and disclosure requirements).
  • Where Filed: County Recorder’s Office where the property is located.
  • When Filed: Prior to the performance of any labor or work or the furnishing of any materials (ORC § 1311.04(A)(1)).
  • Required Contents: Legal description, property address, owner info, original contractor info, lender info, designee info (if any), and specific statutory warning language.
  • Effect on Lien Rights / Priority: Establishes the formal chronological start date of the project for lien priority purposes. It also legally triggers the requirement for subcontractors to serve a Notice of Furnishing (unless it is a home construction contract).
  • Lender Action Item: The lender should verify the mortgage is recorded first, followed immediately by the recording of the Notice of Commencement, prior to any visible work commencing.

Preliminary Notices

  • Notice of Furnishing
  • Who Must Send / File: Subcontractors and material suppliers (not in direct privity with the owner). For non-home private improvements where a Notice of Commencement is recorded, a subcontractor or material supplier generally serves the Notice of Furnishing on the owner/designee and original contractor within 21 days after first labor or materials.
  • Lender Receipt: If a lender is named in the Notice of Commencement, a subcontractor or material supplier may send the lender a copy, but service on the lender is not required to preserve lien rights and receipt imposes no implied statutory duty on the lender regarding disbursement or payment (ORC § 1311.05(A)). Lenders should still log the notice as a best practice.
  • Recipient: Owner (or Designee) & Original Contractor
  • Deadline: Within 21 days of first performing labor or furnishing materials.
  • Citation: ORC § 1311.05(A)
  • Effect of Missing: For applicable non-home projects where a Notice of Commencement has been recorded, failure to timely serve a Notice of Furnishing generally limits lien rights to labor/materials furnished in the 21 days immediately preceding late service of the notice. This requirement does not apply to home construction contracts under ORC § 1311.04(O).
  • Written Request for Balance
  • Who Must Send / File: Under ORC § 1311.14(C), any original contractor, subcontractor, material supplier, or laborer may request the exact mortgage fund balance and aggregate amount included in notices filed with the mortgagee.
  • Recipient: Mortgagee (Lender)
  • Deadline: Anytime during construction.
  • Citation: ORC § 1311.14(C)
  • Effect of Missing: The mortgagee must correctly inform the requester. Failure to inform the requester of the exact balance creates a $100 statutory liability per failure. Lenders should have an escalation step for legal/operations review when these requests are received.

Construction Mortgage Notices Served on Mortgagee

A lender should distinguish between a Notice of Furnishing and a written notice served on the mortgagee under ORC § 1311.14.

A Notice of Furnishing may be copied to a lender named in the Notice of Commencement, but service on the lender is not required to preserve lien rights, and receipt of a Notice of Furnishing does not impose an implied statutory duty on the lender regarding loan disbursements.

Separately, ORC § 1311.14 permits a laborer or material supplier claiming or potentially claiming lien rights to serve a written notice on the mortgagee stating the nature of labor, work, or materials and the amount claimed or to be claimed. These notices must be tracked because they affect the mortgagee’s statutory disbursement order. To preserve construction mortgage priority, the mortgagee must follow the statutory mortgage-fund disbursement and retention rules, including retaining sufficient funds to complete the improvement and addressing noticed laborer/material supplier claims as required by ORC § 1311.14.

  • Lender Action Item: Upon receipt of any written notice addressed to the mortgagee asserting unpaid labor, materials, or lien rights, immediately escalate to construction loan operations, legal counsel, and the title insurer. Do not treat the notice as merely informational until it is confirmed whether it is a Notice of Furnishing, a claim notice under ORC § 1311.14, a written residential lien-claim notice under ORC § 1311.011, or another form of payment dispute.

Notice of Completion / Notice of Termination / Equivalent

Ohio does not use a Notice of Completion to shorten the mechanics lien filing deadline. However, ORC § 1311.04(T) permits an owner, part owner, lessee, or agent, upon completion of the improvement, to record an affidavit stating that the improvement is complete. Upon receipt, the county recorder indicates in the official records that the Notice of Commencement has expired. This completion affidavit does not extend, shorten, or otherwise affect mechanics lien filing deadlines or other rights, requirements, or limitations under ORC Chapter 1311. Lenders should not treat the affidavit as eliminating the 60-day or 75-day lien tail risk.

If a completion affidavit is recorded under ORC § 1311.04(T), the owner, part owner, lessee, or agent must serve a copy of the recorded affidavit by regular mail on the original contractor and any subcontractor or lower-tier project participant that served a Notice of Furnishing. Service defects do not extend lien deadlines or affect rights under ORC Chapter 1311.

Bonding Around Liens / Discharging Liens

  • If a mechanics lien is recorded, it may disrupt the lender’s ability to obtain clear title endorsements for subsequent draws.
  • Substitution of Bond: Under ORC § 1311.11, the owner, general contractor, or any interested party may substitute a bond or cash deposit for the property to discharge the mechanics lien.
  • Filing Procedure: The security must be double the claim if the lien claim is $5,000 or less, and 1.5 times the claim if the claim exceeds $5,000. It must be filed with the court and court approval is required (ORC § 1311.11(C)).
  • Lender Caution: The lien is void and the property is discharged only as of the court’s entry approving the security; lenders should wait for title confirmation before resuming funding.

Lien Enforcement, Continuance, and Notice to Commence Suit

Ohio mechanics liens are filed within the applicable deadline under ORC § 1311.06, but filing the lien does not end the lender’s analysis. Once filed, a mechanics lien continues in force for six years after the affidavit is filed with the county recorder. If an enforcement action is brought within that period, the lien continues until final adjudication.

Ohio also provides a procedure to force lienholder action. An owner, part owner, lessee, mortgagee, or other person with an interest in the real property may serve a notice requiring the lienholder to commence suit. If the lienholder fails to commence suit within 60 days after service is completed, or if the action is commenced but dismissed with prejudice before adjudication, the lien is void and the property is discharged from the lien.

  • Lender Action Item: When a recorded mechanics lien appears, freeze affected advances, escalate to counsel and the title insurer, determine whether bonding, settlement, release, or notice-to-commence-suit is appropriate, and obtain title confirmation before resuming funding.

Document References

  • Notice of Commencement: (Statutory - ORC § 1311.04) Recorded by the owner before work begins. Matters to the lender because it fixes the lien priority date and triggers sub-tier notice requirements where applicable.
  • Notice of Furnishing: (Statutory - ORC § 1311.05) Sent by sub-tiers to the owner within 21 days of starting work on non-home private improvements. Matters to the lender as an early-warning system mapping the lower-tier supply chain.
  • Original Contractor’s Affidavit (Sworn Statement): (Statutory - ORC § 1311.011(B)(4)) A sworn statement mapping the supply chain and detailing unpaid claims. See the dedicated section above for lender implications and applicability.
  • Affidavit for Mechanics Lien: (Statutory - ORC § 1311.06) The formal recorded lien document. Must be filed within 60 days (residential) or 75 days (commercial) of last work.
  • Owner’s Affidavit of Full Payment: (Statutory - ORC § 1311.011(B)(1)) Recorded by a residential owner to declare the GC has been paid in full, supporting the residential payment-in-full defense where the statutory conditions are satisfied.

Contractor Licensing & Bond Requirements

  • Commercial/Residential General Contractors

  • License / Registration Requirement: Local/Municipal Registration. General contractor, home improvement contractor, permit, bond, insurance, and registration requirements may be local and must be verified jurisdiction by jurisdiction.

  • Threshold: Varies locally

  • Agency: Municipal Building Depts (e.g., City of Columbus, Cincinnati)

  • Citation / Source: Local Ordinances

  • Lender Action: Verify local business registration and permit bonds directly with the city/county before funding.

  • Specialty Trades (State Licensed)

  • License / Registration Requirement: OCILB state licensing applies to covered commercial specialty trades, including electrical, HVAC, hydronics, plumbing, and refrigeration.

  • Threshold: Covered Commercial Projects

  • Agency: Ohio Construction Industry Licensing Board (OCILB)

  • Citation / Source: ORC Chapter 4740 and official OCILB sources. ORC Chapter 4740 defines covered construction projects to exclude residential buildings as defined in ORC § 3781.06, so state OCILB licensing should be verified for covered commercial specialty trades, while local requirements should be verified separately for residential and general contractor work.

  • Lender Action: For construction lending, licensing verification should include OCILB lookup for covered commercial trades and local building department verification for local requirements.

  • Consequences of Unlicensed Contracting: Unlicensed contracting may create permitting, enforcement, underwriting, payment, and legal collectability risk. Lenders should condition initial funding on the verification of all required state and local credentials.

Frequently Asked Questions

Our pre-closing site inspection revealed that the contractor delivered a load of lumber and placed a dumpster on the site before our mortgage was recorded. How does this impact our priority?

This creates a serious title and priority issue that must be escalated before closing or funding. Under ORC § 1311.13, work or materials furnished before a Notice of Commencement can create mechanics lien relation-back risk. However, Ohio also has a construction mortgage priority statute, ORC § 1311.14, that may give a qualifying construction mortgage priority over mechanics liens filed after the construction mortgage is recorded, to the extent the mortgage and disbursements comply with the statute. Lender Action: Do not assume either that priority is lost or that priority is protected. Escalate immediately to Ohio counsel and the title insurer. Confirm whether the mortgage qualifies under ORC § 1311.14, whether required construction mortgage language is included, whether any lien has already been filed, whether the title insurer will insure priority, and whether additional affidavits, indemnities, payoffs, holdbacks, endorsements, or corrective steps are required before funding.

A subcontractor served us (the lender) with a written request demanding to know the exact balance of the mortgage fund. Can we ignore this request for borrower privacy?

No. Under ORC § 1311.14(C), any original contractor, subcontractor, material supplier, or laborer may request the exact mortgage fund balance and aggregate amount included in notices filed with the mortgagee. Lender Action: Any ORC § 1311.14(C) balance request must be escalated immediately to legal or operations for review. The mortgagee must correctly inform the requester of the exact balance of the mortgage fund and aggregate amount included in notices filed with the mortgagee; failure carries a $100 statutory liability per failure.

We are funding a single-family residential build. The general contractor submitted a draw, but we did not receive any Notices of Furnishing from the subcontractors. Should we rely on this to assume there is no sub-tier lien risk?

No. In a single-family home construction contract, the lender should not rely on the absence of Notices of Furnishing as proof that sub-tier lien risk is limited, because ORC § 1311.05 Notice of Furnishing requirements do not apply to home construction contracts even when a lender-required NOC is recorded. Lender Action: The lender must require the original contractor affidavit under ORC § 1311.011(B)(4), collect releases, use joint checks or direct payments where appropriate, and follow ORC § 1311.011 holdback procedures for known claims.

The project is finished, and the commercial borrower wants us to release the 10% retainage immediately. Is it safe to release the final draw upon the issuance of the Certificate of Occupancy?

Releasing the final draw immediately upon the Certificate of Occupancy carries “tail risk.” In Ohio, commercial mechanics liens can be filed up to 75 days from the date on which the last labor or material was furnished (ORC § 1311.06(B)(3)). Because Ohio does not have a statutory Notice of Completion or completion affidavit that shortens the lien filing window, the property remains exposed. Lender Action: As a best practice, condition the final retainage release on a final title date-down endorsement verifying no liens were filed, and require the GC to provide Unconditional Final Waivers from all known major subcontractors.

A lien was filed midway through a commercial construction project, and the title company will not issue our ALTA 33 endorsement. How can we resume funding?

A recorded mechanics lien impairs your title, and title insurers will typically halt endorsements until it is resolved. Under ORC § 1311.11, the owner or GC can substitute a bond or cash deposit to discharge it from the real property. Lender Action: Freeze disbursements and instruct the borrower to “bond off” the lien through the court. The lien is void and the property is discharged only as of the court’s entry approving the security; lenders should wait for title confirmation before resuming funding.

Citation Table

  • Notice of Commencement: ORC § 1311.04
  • Notice of Furnishing: ORC § 1311.05
  • Notice of Completion/Completion Affidavit: ORC § 1311.04(T)(3)-(4)
  • Lien Filing Deadlines (60 vs 75 days): ORC § 1311.06(B)(1) & (B)(3)
  • Residential “Payment in Full” Defense & GC Affidavit: ORC § 1311.011(B)(1), (B)(4)-(8)
  • Mortgage Priority & Relation-Back: ORC §§ 1311.13(A)-(F), 1311.14
  • Construction Mortgage Safe Harbor: ORC §§ 1311.13, 1311.14(A)-(B)
  • Same-Day Recording Rule: ORC § 1311.13(G)
  • Bonding Off Liens: ORC § 1311.11(C)
  • Lien Enforcement & Continuance: ORC §§ 1311.13(C), 1311.11(A)-(B)
  • Prompt Payment (Prime to Sub): ORC § 4113.61(A), (C), and (D), (B)(1)-(3)
  • Lien Waivers: ORC §§ 4113.61(D)(1), 4113.62(A), (B), (D), and (E)
  • Contractor Licensing (Specialty Trades): ORC Chapter 4740

Statutes and disclaimer

State statute reference

§ 1311.01 et. seq.
Ohio Revised Code (ORC) Chapter 1311
Last statutory change
2025 — House Bill 96: Adding a completion affidavit and expiring a notice of commencement after four years
Reviewed
May 7, 2026 by Land Gorilla

Disclaimer

Information on this website is provided for informational purposes only and is not intended to be legal advice or establish an attorney-client relationship. Construction law can change at any time, so the information on this website may not be the most up-to-date information available. The information on this website is posted “as is” and no representations are made that the content is without errors. Use of this website does not create an attorney-client relationship between Land Gorilla, content creators, law firms, and any other contributors to this website. Users of this website should contact their own legal counsel for advice with respect to any legal matters.